Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario.  Produced by the NFB for Atomic Energy of Canada Limited.
                                        Genre: Documentary
Stars:
Crew: Dennis Sawyer (Producer), Kenneth McCready (Script), Bernard Bordeleau (Sound Editor)
Country: Canada
Language: English
Studio: ONF | NFB
Runtime: 22 minutes
Quality: HD
Released: Jan 01, 1971
IMDb: 10
Keywords:nuclear power, candu
                                    